Line 8: Line 8:
Date: 2021/10/15 13:00- Date: 2021/10/15 13:00-13:25
Line 10: Line 10:
Participants: Participants: Takahashi, Hirata, Miyoki, Yasui, Ikeda, Ushiba, Uchiyama, Yokozawa, Sato, Node
Line 28: Line 28:
 * Heater control:  * Heater control: To PRs in the next.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/10/15 13:00-13:25

Participants: Takahashi, Hirata, Miyoki, Yasui, Ikeda, Ushiba, Uchiyama, Yokozawa, Sato, Node

Post O3 Upgrade portal

Schedule

  • IX: Health check. F0 behavire.
  • EX: Health check.
  • IY: (LVDT driver. Cable check.)
  • EY: H4 geophone. F0 FR. Height adjustment. LVDT driver. IP position. Insulator repair.

Status

  • TM height setting: ITMY
  • Commissioning in air: Health check.
  • Commissioning in vacuum:
  • Overall commissioning:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers: Under the bidding process.
  • Heater control: To PRs in the next.

Discussion


VIS Meeting

Date: 2021/10/15 14:00-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team:
  • Type-B team:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 10/18

  • Hirata: 10/18-22
  • Yano: 10/18-22

The week from 10/25

  • Takahashi: 10/26-29
  • Sato: 10/26-29
  • Hirata: 10/26-29
  • Yano: 10/25-29

Next meeting

  • 2021/10/22(FRI)

KAGRA/Subgroups/VIS/VISMinutes20211015 (last edited 2021-10-15 14:57:17 by RyutaroTakahashi)