Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/1/7 13:00-
Participants:
Schedule
- IX: Investigating the glich in the F3 signals. Go to the health check.
- EX: Go to the health check.
- IY:
- EY: Implementing the damping controls. Repair of F0 actuator. Preparation of ACCs.
Status
- Replacement of flip cables: SR2
- TM height setting: ITMY.
- Oplev: Setup of the TM Oplev in IY after the TM alignment.
- ACC: Experiments in IX/EX. Preparation for EY.
- Commissioning in air: Return of GRY.
- Commissioning in vacuum:
- Overall commissioning:
- Acceptance check:
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers:
- Heater control: IXV/EXV
- Power source for Oplev:
Discussion
VIS Meeting
Date: 2022/1/7 14:00-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A team: ACC in EY, Heter test in IXV/EXV
- Type-B team:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 1/11
- Takahashi: 1/12-14
- Sato: 1/12-14
- Hirata: 1/12-14
The week from 1/17
- Takahashi: 1/17-21
- Sato: 1/17-21
- Hirata: 1/17-21
Next meeting
- 2022/1/14(FRI)