CRY+VIS Interface Meeting
Date: 2022/1/14 13:00-
Participants:
Schedule
- IX: Health check. Glitch in the F3 signals.
- EX: Health check.
- IY:
- EY: Alignment. Preparation for ACCs.
Status
- Replacement of flip cables: SRM was finished. Cables for Type-C will be delivered in the end of Jan.
- TM height setting: ITMY.
- Oplev: Setup of the TM Oplev in IY after the TM alignment.
- ACC: Preparation for EY.
- Commissioning in air: Return of GRY. Alignment of SR3/ETMY.
- Commissioning in vacuum:
- Overall commissioning:
- Acceptance check:
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers: Cabling of the power line in IXV/EXC on 1/11-12.
- Heater control: Test in IXV/EXV is planed. Repaired power controller will be delivered soon.
- Power source for Oplev:
Discussion
VIS Meeting
Date: 2022/1/14 14:00-
Participants:
Summary Report
Type-A
- Preparing for the ACCs in EY. The tuning of the resonant frequency was finished.
- Fixed the cables around the IP in EY.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A team: Preparation for the ACCs in EY, Heter test in IXV/EXV
- Type-B team:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 1/17
- Takahashi: 1/18-21
- Sato: 1/18-21
- Hirata: 1/18-21
The week from 1/24
- Takahashi: 1/24-28
- Sato: 1/24-28
- Hirata: 1/24-28
Next meeting
- 2022/1/21(FRI)