Differences between revisions 2 and 3
Revision 2 as of 2022-03-10 17:30:14
Size: 1609
Comment:
Revision 3 as of 2022-03-10 22:43:58
Size: 2126
Comment:
Deletions are marked like this. Additions are marked like this.
Line 43: Line 43:
 * Recovered the F2 in IY. The BF was disconnected from the filter chain once, and the F2 was rotated at the F0 receptacle so that the stuck-out cable on the F2 can stay apart from the pole.
 * The resonant frequencies of the IP became almost the same in L and T. The IP was tuned to 70mH for L and 60mHz for T.
 * The resonant frequency of F2 is very low (0.1Hz). The drift is large. Though the height range of the keystone is large enough, the FR range is very small. The FR is easily stuck on the lower side.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/3/11 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • IX: Glitch in the Oplev signal.
  • EX: Health check.
  • IY: Recovery of the F2.
  • EY: Installation of the accelerometers.

Status

  • Replacement of flip cables: The spare feedthrough flange was an old KAGRA type (8 connectors).
  • TM height setting: ITMY.
  • Oplev: Setup of the Oplev in EY was almost done. Not yet in IY.
  • ACC: Installation in EY.
  • Commissioning in air: Alignment of ITMY.
  • Commissioning in vacuum:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers:
  • Heater control: Test in IXV/EXV.
  • Power source for Oplev:
  • TMS:

Discussion


VIS Meeting

Date: 2022/3/11 14:00-

Participants:

Summary Report

Type-A

  • Recovered the F2 in IY. The BF was disconnected from the filter chain once, and the F2 was rotated at the F0 receptacle so that the stuck-out cable on the F2 can stay apart from the pole.
  • The resonant frequencies of the IP became almost the same in L and T. The IP was tuned to 70mH for L and 60mHz for T.
  • The resonant frequency of F2 is very low (0.1Hz). The drift is large. Though the height range of the keystone is large enough, the FR range is very small. The FR is easily stuck on the lower side.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team: Alignment and height check of ITMY.
  • Type-B team:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 3/14

  • Takahashi: 3/15-18
  • Sato: 3/15-18
  • Hirata: 3/15-18

The week from 3/21

  • Takahashi: 3/22-25
  • Sato: 3/22-25
  • Hirata: 3/22-25

Next meeting

  • 2022/3/18(FRI)