Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/4/22 13:00-13:20

Participants: Takahashi, Ikeda, Sato, Yasui, Uchiyama, Aso, Akutsu, Ushiba, Yokozawa

Post O3 Upgrade portal

Schedule

Status

Discussion


VIS Meeting

Date: 2022/4/22 14:00-

Participants:

Summary Report

Type-A

Type-B

* Takahashi-san compared SR2 IP TF measurements with those of SRM, and found some discrepancies. The problem was likely produced by the geophone integrator being off. In SR2 it has to be turned on by hand. I measured the same TFs this week and they are fine.

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 4/25

The week from 5/2

Next meeting