Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/6/10 13:00-

Participants:

Post O3 Upgrade portal

Schedule

Status

Discussion


VIS Meeting

Date: 2022/6/10 14:00-

Participants:

Summary Report

Type-A

Type-B

In SR2 we identified that geophone 2 had a problem, so we replaced it with a spare one. Takahashi-san gave me the information about calibration factors, but I still have to take a look at it.

Type-Bp

Type-C

Electronics

Control

Schedule

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 6/13

The week from 6/20

Next meeting