Revision 1 as of 2022-06-30 20:06:56
Size: 1671
Comment:
Revision 13 as of 2022-07-01 17:22:54
Size: 2956
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Date: 2022/7/1 13:00- Date: 2022/7/1 13:15-13:40
Line 10: Line 10:
Participants: Participants: Takahashi, Hirata, Ikeda, Miyoki, Yokozawa, Ushiba, Akutsu, Kimura, Aso
Line 18: Line 18:
 * EY: Repair of the leak point. Health check and pump-down.  * EY: Repair of the leak point. Health check and pump-down. Leak test in the next week.
Line 20: Line 20:
 * Type-Bp: Investigation of the PR2 suspension. Calibration of the BF damper LVDT in PRM.
Cable check in PR2, PR3, and PRM.
 * Type-Bp: Investigation of the PR2 suspension. Calibration of the BF damper LVDT in PRM. Cable check in PR2, PR3, and PRM.
Line 27: Line 26:
 * Oplev:  * Oplev: Wind shield for Type-Bp.
Line 33: Line 32:
 * New vacuum pumps for V-chambers:  * New vacuum pumps for V-chambers: When should we implement the ion pumps? It is better to do before cooling.
Line 35: Line 34:
 * TMS: Window to EYT.  * TMS: DN400 flange for the window in EYT.
Line 40: Line 39:
Date: 2022/6/24 14:00- Date: 2022/6/24 14:00-14:30
Line 42: Line 41:
Participants: Participants: Takahashi, Fabian, Ushiba, Washimi, Aso, Tanaka, Sato, Hirata
Line 46: Line 45:
 * Monitored during the pump down in EY.
Line 47: Line 48:
 * In SR3, we removed the First Contact on Monday and released the suspension. Then AOS team installed the midsize baffle in SR3 and SRM.
 * Yokozawa-san and Fabian measured the beam profile and power of the SR2 oplev.
Line 48: Line 52:
 * Investigated the suspension in PR2.
 * Cable check in PR2/PR3/PRM.
 * In PRM, we calibrated again the BF Damper vertical LVDTs by moving the BF with the SF keystone. The new values were written in the medm screen and accepted in the SDF.
 * In PRM, We calibrated again the BF Damper horizontal LVDTs using the oplev and the design value of the position of the LVDTs. There is an apparent inconsistency with the sign and I need to double-check. I haven't written the new values in the medm screen yet.
Line 60: Line 69:
 * Assembly frame in SR booth

Disassembly of the assembly frame for Type-B was suggested to make working space. However, we don't need more space for the mirror replacement in SRM in the next week.
Line 68: Line 81:
 * Aso: 7/4-7

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/7/1 13:15-13:40

Participants: Takahashi, Hirata, Ikeda, Miyoki, Yokozawa, Ushiba, Akutsu, Kimura, Aso

Post O3 Upgrade portal

Schedule

  • IX:
  • EX:
  • IY: To cooling.
  • EY: Repair of the leak point. Health check and pump-down. Leak test in the next week.
  • Type-B: Recovery of the alignment after cleaning in SR3. Characterization of the OpLev in SR2. Installation of the MSBs in SR3 and SRM. Replacement of the mirror in SRM in the next week.

  • Type-Bp: Investigation of the PR2 suspension. Calibration of the BF damper LVDT in PRM. Cable check in PR2, PR3, and PRM.
  • Type-C: Health check should be scheduled.

Status

  • Replacement of flip cables: EXT and BF temp.
  • TM height setting:
  • Oplev: Wind shield for Type-Bp.
  • ACC:
  • Commissioning in air:
  • Commissioning in vacuum:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers: When should we implement the ion pumps? It is better to do before cooling.
  • Heater control: Pending.
  • TMS: DN400 flange for the window in EYT.

Discussion


VIS Meeting

Date: 2022/6/24 14:00-14:30

Participants: Takahashi, Fabian, Ushiba, Washimi, Aso, Tanaka, Sato, Hirata

Summary Report

Type-A

  • Monitored during the pump down in EY.

Type-B

  • In SR3, we removed the First Contact on Monday and released the suspension. Then AOS team installed the midsize baffle in SR3 and SRM.
  • Yokozawa-san and Fabian measured the beam profile and power of the SR2 oplev.

Type-Bp

  • Investigated the suspension in PR2.
  • Cable check in PR2/PR3/PRM.
  • In PRM, we calibrated again the BF Damper vertical LVDTs by moving the BF with the SF keystone. The new values were written in the medm screen and accepted in the SDF.
  • In PRM, We calibrated again the BF Damper horizontal LVDTs using the oplev and the design value of the position of the LVDTs. There is an apparent inconsistency with the sign and I need to double-check. I haven't written the new values in the medm screen yet.

Type-C

Electronics

Control

Schedule

  • Type-A:
  • Type-B: Mirror replacement in SRM.
  • Type-Bp: Health check.
  • Type-C:

Safety

Discussion

  • Assembly frame in SR booth

Disassembly of the assembly frame for Type-B was suggested to make working space. However, we don't need more space for the mirror replacement in SRM in the next week.

Travel Plans

(Date in Kamioka)

The week from 7/4

  • Takahashi: 7/5-8
  • Sato:
  • Hirata: 7/5-8
  • Aso: 7/4-7

The week from 7/11

  • Takahashi:
  • Sato:
  • Hirata:

Next meeting

  • 2022/7/8(FRI)

KAGRA/Subgroups/VIS/VISMinutes20220701 (last edited 2022-07-01 17:22:54 by RyutaroTakahashi)