Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/7/8 13:00
Participants:
Schedule
IX: Offload of the F0. Adujustment of the OpLev for MN/PF.
EX: Adujustment of the OpLev for MN/PF.
- IY:
- EY: Leak test. Repair of the GV. Offload of the GAS filters.
- Type-B: Replacement of the mirror in SRM.
Type-Bp: Adujustment of the OpLev in PR2/PR3. Investigation of the PR2 suspension. Health check in the next week.
- Type-C: Health check of the IMMT1/2 in the next week.
Status
- Replacement of cables: EXT and BF temp.
- TM height setting:
- Oplev:
- ACC:
- Commissioning in air:
- Commissioning in vacuum:
- Acceptance check:
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers: When should we implement the ion pumps? It is better to do before cooling.
- Heater control: Pending.
- TMS:
Discussion
VIS Meeting
Date: 2022/7/8 14:00-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B: Health check.
- Type-Bp: Health check.
- Type-C: Health check of IMMT1/2.
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 7/11
- Hirata: 7/12-15
The week from 7/18
- Sato:
- Hirata:
Next meeting
- 2022/7/15(FRI)