* Type-C: Shift of the OMMT2 suspension | * Type-C: Shift of the OMMT2 suspension. Health check of the IMMT suspensions. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/9/16 13:00-
Participants:
Schedule
- Type-A: Installation of the windshields in EY.
- Type-B: Monitoring of the evacuation.
- Type-Bp: Recovery of the BF GAS in PR3. Monitoring of the evacuation. Centering of the oplev in PR2.
- Type-C: Shift of the OMMT2 suspension in the next week.
Status
- Replacement of cables: EXT remains.
- TM height setting:
- Oplev:
- ACC:
- Commissioning in air:
- Commissioning in vacuum: MICH and FPMI Lock.
Acceptance check: DropboxPaper
- Vacuum system: Pump down of the center area from 9/13.
- Heater control: Pending.
- TMS:
Discussion
VIS Meeting
Date: 2022/9/16 14:00-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B:
- Type-Bp:
- Type-C: Shift of the OMMT2 suspension. Health check of the IMMT suspensions.
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 9/19
- Takahashi: 9/20-22
- Aso: 9/20-22
The week from 9/26
- Takahashi:
- Sato:
- Hirata:
Next meeting
- 2022/9/30(FRI)