Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/9/30 13:00-
Participants:
Schedule
- Type-A: Offload of the BF GAS in IY.
- Type-B: Windshield in BS.
- Type-Bp: Windshield in PR2/PR3.
- Type-C: Health check of the IMMT suspensions. Recovery of the OMMT1/2/OSTM suspensions. Final check of the OMMT/OSTM suspensions in the next week.
Status
- Replacement of cables: EXT remains.
- TM height setting:
- Oplev: Windshields.
- ACC: Evaluation.
- Commissioning in vacuum:
Acceptance check: DropboxPaper
- Vacuum system: Closing of the IMMT-IFI-PRM chambers. Leak check.
- Heater control: Pending.
- TMS:
Discussion
VIS Meeting
Date: 2022/9/30 14:00-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B:
- Type-Bp:
- Type-C: Final check of the OMMT/OSTM suspensions.
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 10/3
- Takahashi: 10/3-7
- Hirata: 10/4-7
- Aso: 10/3-6
The week from 10/10
- Takahashi:
- Sato:
- Hirata:
Next meeting
- 2022/10/7(FRI)