1529
Comment:
|
1636
|
Deletions are marked like this. | Additions are marked like this. |
Line 15: | Line 15: |
* Type-A: Offload of the F2 in EY. | * Type-A: Offload of the F2 in EY. Update of the MN Pitch control in IX. |
Line 48: | Line 48: |
* Type-A: | * Type-A: Lucia will work with these suspensions today and the whole next week. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/11/4 13:00-
Participants:
Status
- Type-A: Offload of the F2 in EY. Update of the MN Pitch control in IX.
- Type-B: Optimization of the IP controls (Blending filter, etc.). Fixing of the D-sub connectors.
- Type-Bp:
- Type-C: Finalization of the OMMT1/2/OSTM suspensions in the next week.
Other items
- Replacement of cables: EXT remains.
- Oplev:
- ACC:
- Commissioning: Lock of the PR cavity.
- Vacuum system: GV opening in EYT after 11/15. Moving of the dry pump in EYT on 11/4.
- Heater control: Test in EY.
- TMS:
Discussion
VIS Meeting
Date: 2022/11/4 13:30-
Participants:
Summary Report
Type-A
- Offloaded the F2 in EY. The heater on the cross tube was not effective for the F2.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: Lucia will work with these suspensions today and the whole next week.
- Type-B: Optimization of IP controls.
- Type-Bp:
- Type-C: Finalization of the OMMT1/2/OSTM suspensions.
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 11/7
- Takahashi: 11/7-10
- Aso: 11/7-10
The week from 11/14
- Takahashi: 11/16-18
- Hirata:
- Sato:
Next meeting
- 2022/11/11(FRI) 13:30