Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/11/4 13:00-13:10
Participants: Takahashi, Mitsuhashi, Uchiyama, Kimura, Yasui, Node, Ikeda
Status
- Type-A: Offload of the F2 in EY. Update of the MN Pitch control in IX.
- Type-B: Optimization of the IP controls (Blending filter, etc.). Fixing of the D-sub connectors.
- Type-Bp:
- Type-C: Finalization of the OMMT1/2/OSTM suspensions in the next week.
Other items
- Replacement of cables: EXT remains.
- Oplev:
- ACC:
- Commissioning: Lock of the PR cavity.
- Vacuum system: GV opening in EYT after 11/15. Moving of the dry pump in EYT on 11/4.
- Heater control: Test in EY.
- TMS:
Discussion
VIS Meeting
Date: 2022/11/4 13:30-13:50
Participants: Takahashi, Fabian, Mitsuhashi, Tanaka, Lucia
Summary Report
Type-A
- Offloaded the F2 in EY. The heater on the cross tube was not effective for the F2.
Type-B
- At the racks outside the clean rooms, we used screws to secure the connectors that use gender benders. We checked all other connectors also, outside and inside the clean rooms (mini rack).
- I wrote a script to blend LVDT and geophones, based on Terrence's methods and tutorial. It's still a work in progress, but I might be ready to test the results in a suspension next week.
Type-Bp
- We also checked the racks for loose connectors. We found very few loose screws, and we tightened them.
Type-C
Electronics
Control
Schedule
- Type-A: Lucia will work with these suspensions today and the whole next week.
Type-B: Optimization of IP controls. Maybe testing the filters generated with Terrence's method.
- Type-Bp:
- Type-C: Finalization of the OMMT1/2/OSTM suspensions.
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 11/7
- Takahashi: 11/7-10
- Aso: 11/7-10
- Fabian: 11/9-10(absent)
The week from 11/14
- Takahashi: 11/16-18
- Hirata:
- Sato:
Next meeting
- 2022/11/11(FRI) 13:30