Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/11/4 13:00-

Participants:

Acceptance check document

Status

  • Type-A: Offload of the F2 in EY. Update of the MN Pitch control in IX.
  • Type-B: Optimization of the IP controls (Blending filter, etc.). Fixing of the D-sub connectors.
  • Type-Bp:
  • Type-C: Finalization of the OMMT1/2/OSTM suspensions in the next week.

Other items

  • Replacement of cables: EXT remains.
  • Oplev:
  • ACC:
  • Commissioning: Lock of the PR cavity.
  • Vacuum system: GV opening in EYT after 11/15. Moving of the dry pump in EYT on 11/4.
  • Heater control: Test in EY.
  • TMS:

Discussion


VIS Meeting

Date: 2022/11/4 13:30-

Participants:

Summary Report

Type-A

  • Offloaded the F2 in EY. The heater on the cross tube was not effective for the F2.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: Lucia will work with these suspensions today and the whole next week.
  • Type-B: Optimization of IP controls. Maybe testing the filters generated with Terrence's method.

  • Type-Bp:
  • Type-C: Finalization of the OMMT1/2/OSTM suspensions.

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 11/7

  • Takahashi: 11/7-10
  • Aso: 11/7-10

The week from 11/14

  • Takahashi: 11/16-18
  • Hirata:
  • Sato:

Next meeting

  • 2022/11/11(FRI) 13:30