Differences between revisions 1 and 6 (spanning 5 versions)
Revision 1 as of 2022-12-08 15:51:21
Size: 1197
Comment:
Revision 6 as of 2022-12-09 14:11:12
Size: 2150
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Date: 2022/12/9 13:00- Date: 2022/12/9 13:00-13:15
Line 10: Line 10:
Participants: Participants: Takahashi, Ushiba, Kimura, Yokozawa, Yasui, Sato, Uchiyama, Akutsu, Aso, Miyoki, Node
Line 15: Line 15:
 * Type-A: Replacement of the coil driver for ACC in IX.  * Type-A: Replacement of the coil drivers for ACC in IX/IY.
Line 18: Line 18:
 * Type-C:  * Type-C: OMC experiment in the next week.
Line 22: Line 22:
 * Oplev:  * Oplev: Glitch was observed in EY.
Line 25: Line 25:
 * Vacuum system:  * Vacuum system: GV was closed on 12/9.
Line 33: Line 33:
Date: 2022/12/9 13:30- Date: 2022/12/9 13:30-13:55
Line 35: Line 35:
Participants: Participants: Takahashi, Uchiyama, Fabian, Mitsuhashi, Tanaka, Ushiba
Line 39: Line 39:
 * Replaced the coil drivers for ACC from HPC to LPC for Cryo-payload in IX/IY.
Line 40: Line 42:
In the context of F0 LVDT sensor correction,
 * The idea of using the force TF to compensate the lack of data in the displacement TF was successfully tested for SR3.
 * Inter-calibration factors with the ground seismometer were calculated for SR2 and BS.
Line 41: Line 46:
In the context of SF LVDT sensor correction,
 * Inter-calibration factors for PRM, PR3 and PR2 were calculated, but
 * Only the one for SR3 seems reliable, because in the others, the 2nd peak appears at different frequencies in the displacement and force TFs. This means the force TF cannot be used for the calculation.
Line 48: Line 56:
 * Type-B:
 * Type-Bp:
 * Type-B: Vertical sensor correction.
 * Type-Bp: Vertical sensor correction.
Line 60: Line 68:
 * Hirata: 12/13-16  * Hirata: 12/13-15

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/12/9 13:00-13:15

Participants: Takahashi, Ushiba, Kimura, Yokozawa, Yasui, Sato, Uchiyama, Akutsu, Aso, Miyoki, Node

Acceptance check document

Status

  • Type-A: Replacement of the coil drivers for ACC in IX/IY.
  • Type-B: Inter-calibration. Offload of the IP in BS.
  • Type-Bp: Inter-calibration.
  • Type-C: OMC experiment in the next week.

Other items

  • Replacement of cables: EXT remains.
  • Oplev: Glitch was observed in EY.
  • ACC: Replacement of the coil drivers.
  • Commissioning:
  • Vacuum system: GV was closed on 12/9.
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2022/12/9 13:30-13:55

Participants: Takahashi, Uchiyama, Fabian, Mitsuhashi, Tanaka, Ushiba

Summary Report

Type-A

  • Replaced the coil drivers for ACC from HPC to LPC for Cryo-payload in IX/IY.

Type-B

In the context of F0 LVDT sensor correction,

  • The idea of using the force TF to compensate the lack of data in the displacement TF was successfully tested for SR3.
  • Inter-calibration factors with the ground seismometer were calculated for SR2 and BS.

Type-Bp

In the context of SF LVDT sensor correction,

  • Inter-calibration factors for PRM, PR3 and PR2 were calculated, but
  • Only the one for SR3 seems reliable, because in the others, the 2nd peak appears at different frequencies in the displacement and force TFs. This means the force TF cannot be used for the calculation.

Type-C

Electronics

Control

Schedule

  • Type-A: Test of ACCs.
  • Type-B: Vertical sensor correction.
  • Type-Bp: Vertical sensor correction.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 12/12

  • Hirata: 12/13-15
  • Aso: 12/12-15

The week from 12/19

Next meeting

  • 2022/12/16(FRI) 13:30

KAGRA/Subgroups/VIS/VISMinutes20221209 (last edited 2022-12-09 14:11:12 by fabian.arellano)