Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/12/9 13:00-13:15
Participants: Takahashi, Ushiba, Kimura, Yokozawa, Yasui, Sato, Uchiyama, Akutsu, Aso, Miyoki, Node
Status
- Type-A: Replacement of the coil drivers for ACC in IX/IY.
- Type-B: Inter-calibration. Offload of the IP in BS.
- Type-Bp: Inter-calibration.
- Type-C: OMC experiment in the next week.
Other items
- Replacement of cables: EXT remains.
- Oplev: Glitch was observed in EY.
- ACC: Replacement of the coil drivers.
- Commissioning:
- Vacuum system: GV was closed on 12/9.
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2022/12/9 13:30-13:55
Participants: Takahashi, Uchiyama, Fabian, Mitsuhashi, Tanaka, Ushiba
Summary Report
Type-A
- Replaced the coil drivers for ACC from HPC to LPC for Cryo-payload in IX/IY.
Type-B
In the context of F0 LVDT sensor correction,
- The idea of using the force TF to compensate the lack of data in the displacement TF was successfully tested for SR3.
- Inter-calibration factors with the ground seismometer were calculated for SR2 and BS.
Type-Bp
In the context of SF LVDT sensor correction,
- Inter-calibration factors for PRM, PR3 and PR2 were calculated, but
- Only the one for SR3 seems reliable, because in the others, the 2nd peak appears at different frequencies in the displacement and force TFs. This means the force TF cannot be used for the calculation.
Type-C
Electronics
Control
Schedule
- Type-A: Test of ACCs.
- Type-B: Vertical sensor correction.
- Type-Bp: Vertical sensor correction.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 12/12
- Hirata: 12/13-15
- Aso: 12/12-15
The week from 12/19
Next meeting
- 2022/12/16(FRI) 13:30