Differences between revisions 2 and 3
Revision 2 as of 2022-12-08 16:58:16
Size: 1200
Comment:
Revision 3 as of 2022-12-09 11:12:36
Size: 1284
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
 * Type-A: Replacement of the coil driver for ACC in IX/IY.  * Type-A: Replacement of the coil drivers for ACC in IX/IY.
Line 39: Line 39:
 * Replaced the coil drivers for ACC from HPC to LPC for Cryo-payload in IX/IY.
Line 60: Line 62:
 * Hirata: 12/13-16  * Hirata: 12/13-15

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/12/9 13:00-

Participants:

Acceptance check document

Status

  • Type-A: Replacement of the coil drivers for ACC in IX/IY.
  • Type-B: Inter-calibration. Offload of the IP in BS.
  • Type-Bp: Inter-calibration.
  • Type-C:

Other items

  • Replacement of cables: EXT remains.
  • Oplev:
  • ACC: Replacement of the coil drivers.
  • Commissioning:
  • Vacuum system:
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2022/12/9 13:30-

Participants:

Summary Report

Type-A

  • Replaced the coil drivers for ACC from HPC to LPC for Cryo-payload in IX/IY.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: Test of ACCs.
  • Type-B:
  • Type-Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 12/12

  • Hirata: 12/13-15
  • Aso: 12/12-15

The week from 12/19

Next meeting

  • 2022/12/16(FRI) 13:30

KAGRA/Subgroups/VIS/VISMinutes20221209 (last edited 2022-12-09 14:11:12 by fabian.arellano)