Date: 2022/12/9 13:00- Date: 2022/12/9 13:00-13:15
Line 10: Line 10:
Participants: Participants: Takahashi, Ushiba, Kimura, Yokozawa, Yasui, Sato, Uchiyama, Akutsu, Aso, Miyoki, Node
Line 18: Line 18:
 * Type-C:  * Type-C: OMC experiment in the next week.
Line 22: Line 22:
 * Oplev:  * Oplev: Glitch was observed in EY.
Line 25: Line 25:
 * Vacuum system:  * Vacuum system: GV was closed on 12/9.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/12/9 13:00-13:15

Participants: Takahashi, Ushiba, Kimura, Yokozawa, Yasui, Sato, Uchiyama, Akutsu, Aso, Miyoki, Node

Acceptance check document

Status

  • Type-A: Replacement of the coil drivers for ACC in IX/IY.
  • Type-B: Inter-calibration. Offload of the IP in BS.
  • Type-Bp: Inter-calibration.
  • Type-C: OMC experiment in the next week.

Other items

  • Replacement of cables: EXT remains.
  • Oplev: Glitch was observed in EY.
  • ACC: Replacement of the coil drivers.
  • Commissioning:
  • Vacuum system: GV was closed on 12/9.
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2022/12/9 13:30-

Participants:

Summary Report

Type-A

  • Replaced the coil drivers for ACC from HPC to LPC for Cryo-payload in IX/IY.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: Test of ACCs.
  • Type-B:
  • Type-Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 12/12

  • Hirata: 12/13-15
  • Aso: 12/12-15

The week from 12/19

Next meeting

  • 2022/12/16(FRI) 13:30