Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/12/9 13:00-13:15
Participants: Takahashi, Ushiba, Kimura, Yokozawa, Yasui, Sato, Uchiyama, Akutsu, Aso, Miyoki, Node
Status
- Type-A: Replacement of the coil drivers for ACC in IX/IY.
- Type-B: Inter-calibration. Offload of the IP in BS.
- Type-Bp: Inter-calibration.
- Type-C: OMC experiment in the next week.
Other items
- Replacement of cables: EXT remains.
- Oplev: Glitch was observed in EY.
- ACC: Replacement of the coil drivers.
- Commissioning:
- Vacuum system: GV was closed on 12/9.
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2022/12/9 13:30-13:55
Participants: Takahashi, Uchiyama, Fabian, Mitsuhashi, Tanaka, Ushiba
Summary Report
Type-A
- Replaced the coil drivers for ACC from HPC to LPC for Cryo-payload in IX/IY.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: Test of ACCs.
- Type-B: Vertical sensor correction.
- Type-Bp: Vertical sensor correction.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 12/12
- Hirata: 12/13-15
- Aso: 12/12-15
The week from 12/19
Next meeting
- 2022/12/16(FRI) 13:30