Differences between revisions 1 and 2
Revision 1 as of 2023-01-12 16:23:16
Size: 1092
Comment:
Revision 2 as of 2023-01-13 12:33:00
Size: 1266
Comment:
Deletions are marked like this. Additions are marked like this.
Line 38: Line 38:
 * Adjusted the heater control in IY, but the BF GAS has saturated.
 * Replaced the coil driver for the accelerometers from the mid-power one to the low-power one in IY.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/1/13 13:00-

Participants:

Acceptance check document

Status

  • Type-A: Heater control in IY. IM L2P decoupling in EX.
  • Type-B: F0 sensor correction in SR3.
  • Type-Bp:
  • Type-C:

Other items

  • Oplev:
  • ACC: Replacement of LPC in IY.
  • Commissioning:
  • Vacuum system:
  • Heater control: Adjustment in IY
  • TMS:

Discussion


VIS Meeting

Date: 2023/1/13 13:30-

Participants:

Summary Report

Type-A

  • Adjusted the heater control in IY, but the BF GAS has saturated.
  • Replaced the coil driver for the accelerometers from the mid-power one to the low-power one in IY.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: Investigation of ACCs.
  • Type-B/Bp: Vertical sensor correction.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 1/16

Next meeting

  • 2023/1/20(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230113 (last edited 2023-01-13 13:55:07 by RyutaroTakahashi)