Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/1/20 13:00-13:10
Participants: Takahashi, Mitsuhashi, Ikeda, Akutsu, Aso, Sato, Ushiba, Hirata
Status
- Type-A: Test of IP control with ACCs in IY.
- Type-B: SF sensor correction in BS/SR2. Repair of the windshield for Oplev in SR2.
- Type-Bp: SF sensor correction in PR3.
- Type-C:
Other items
- Oplev: Windshield was repaired in SR2.
- ACC: IP control in IY.
- Commissioning:
- Vacuum system: Boot of ISPs in the arm ducts.
- Heater control: Adjustment in IY.
- TMS:
Discussion
VIS Meeting
Date: 2023/1/20 13:30-
Participants:
Summary Report
Type-A
- Implementation of the IP control with ACCs in IY.
- Adjusted the conditioning filters and made a sensing matrix to Euler direction (L, T, Y) for the ACC signals. We confirmed the signals of geophones and ACCs are consistent.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp: Vertical sensor correction.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 1/23
- Aso: 1/23-26
Next meeting
- 2023/1/27(FRI) 13:30-