Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/2/3 13:00-
Participants:
Status
- Type-A: Test of IP control with ACCs in EX/EY. Offload of F0 in IY
- Type-B:
- Type-Bp: Sensor correction for the BF Damper in PRM.
- Type-C: Monitoring of the OMMT1/2/OSTM suspensions.
Other items
- Oplev:
- ACC: IP control in EX/EY.
- Commissioning:
- Vacuum system: Vent and evacuation of the OMT-OMC chamber.
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2023/2/3 13:30-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp: Sensor correction.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 2/6
Next meeting
- 2023/2/10(FRI) 13:30-