Differences between revisions 1 and 2
Revision 1 as of 2023-02-09 16:29:05
Size: 1133
Comment:
Revision 2 as of 2023-02-09 16:30:11
Size: 1134
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
Date: 2023/2/3 13:30- Date: 2023/2/10 13:30-

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/2/10 13:00-

Participants:

Acceptance check document

Status

  • Type-A: IP control with ACCs in EX/EY. Offload of F0 in IY
  • Type-B:
  • Type-Bp: Sensor correction.
  • Type-C:

Other items

  • Oplev:
  • ACC: IP control in EX/EY.
  • Commissioning:
  • Vacuum system:
  • Heater control:
  • TMS: Covering in TMSY on 2-3 March.

Discussion


VIS Meeting

Date: 2023/2/10 13:30-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: Sensor correction.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 2/13

  • Takahashi: 2/15-17
  • Mitsuhashi: 2/15-17

Next meeting

  • 2023/2/17(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230210 (last edited 2023-02-10 13:44:48 by RyutaroTakahashi)