Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/2/10 13:00-13:10
Participants: Takahashi, Ikeda, Aso, Uchiyama, Mitsuhashi, Yokozawa, Akutsu, Kimura, Node, Ushiba
Status
- Type-A: IP control with ACCs in EX. Offload of F0 in IY.
- Type-B:
- Type-Bp: Sensor correction in PRM.
- Type-C:
Other items
- Oplev:
- ACC: IP control in EX.
- Commissioning:
- Vacuum system: ISP power supply for OMC was implemented on 2/8.
- Heater control:
- TMS: Covering in TMSY on 2-3 March.
Discussion
VIS Meeting
Date: 2023/2/10 13:30-13:45
Participants: Takahashi, Mitsuhashi, Ushiba, Uchiyama, Tanaka, Fabian
Summary Report
Type-A
- Test of the IP control with the accelerometers in EX.
Type-B
Type-Bp
- Last week, I calculated the shape of the sensor correction filter for the PRM BF Damper.
- I uploaded the sensor correction filter in the corresponding filter bank.
- I revisited the calculation of the inter-calibration factor between the seismometer on the ground and the BF Damper LVDT in L.
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp: Sensor correction for PR3 and PR2.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 2/13
- Takahashi: 2/15-17
- Mitsuhashi: 2/15-17
Next meeting
- 2023/2/17(FRI) 13:30-