Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2023-02-09 16:29:05
Size: 1133
Comment:
Revision 3 as of 2023-02-10 11:17:06
Size: 1195
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
 * Type-A: IP control with ACCs in EX/EY. Offload of F0 in IY  * Type-A: IP control with ACCs in EX. Offload of F0 in IY
Line 17: Line 17:
 * Type-Bp: Sensor correction.  * Type-Bp: Sensor correction in PRM.
Line 22: Line 22:
 * ACC: IP control in EX/EY.  * ACC: IP control in EX.
Line 32: Line 32:
Date: 2023/2/3 13:30- Date: 2023/2/10 13:30-
Line 38: Line 38:
 * Test of the IP control with the accelerometers in EX.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/2/10 13:00-

Participants:

Acceptance check document

Status

  • Type-A: IP control with ACCs in EX. Offload of F0 in IY
  • Type-B:
  • Type-Bp: Sensor correction in PRM.
  • Type-C:

Other items

  • Oplev:
  • ACC: IP control in EX.
  • Commissioning:
  • Vacuum system:
  • Heater control:
  • TMS: Covering in TMSY on 2-3 March.

Discussion


VIS Meeting

Date: 2023/2/10 13:30-

Participants:

Summary Report

Type-A

  • Test of the IP control with the accelerometers in EX.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: Sensor correction.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 2/13

  • Takahashi: 2/15-17
  • Mitsuhashi: 2/15-17

Next meeting

  • 2023/2/17(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230210 (last edited 2023-02-10 13:44:48 by RyutaroTakahashi)