Line 8: Line 8:
Date: 2023/2/10 13:00- Date: 2023/2/10 13:00-13:10
Line 10: Line 10:
Participants: Participants: Takahashi, Ikeda, Aso, Uchiyama, Mitsuhashi, Yokozawa, Akutsu, Kimura, Node, Ushiba
Line 15: Line 15:
 * Type-A: IP control with ACCs in EX/EY. Offload of F0 in IY  * Type-A: IP control with ACCs in EX. Offload of F0 in IY.
Line 17: Line 17:
 * Type-Bp: Sensor correction.  * Type-Bp: Sensor correction in PRM.
Line 22: Line 22:
 * ACC: IP control in EX/EY.  * ACC: IP control in EX.
Line 24: Line 24:
 * Vacuum system:  * Vacuum system: ISP power supply for OMC was implemented on 2/8.
Line 32: Line 32:
Date: 2023/2/3 13:30- Date: 2023/2/10 13:30-
Line 38: Line 38:
 * Test of the IP control with the accelerometers in EX.
Line 40: Line 42:
 * Last week, I calculated the shape of the sensor correction filter for the PRM BF Damper.
 * I uploaded the sensor correction filter in the corresponding filter bank.
 * I revisited the calculation of the inter-calibration factor between the seismometer on the ground and the BF Damper LVDT in L.
Line 46: Line 51:
 * Type-B/Bp: Sensor correction.  * Type-B/Bp: Sensor correction for PR3 and PR2.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/2/10 13:00-13:10

Participants: Takahashi, Ikeda, Aso, Uchiyama, Mitsuhashi, Yokozawa, Akutsu, Kimura, Node, Ushiba

Acceptance check document

Status

  • Type-A: IP control with ACCs in EX. Offload of F0 in IY.
  • Type-B:
  • Type-Bp: Sensor correction in PRM.
  • Type-C:

Other items

  • Oplev:
  • ACC: IP control in EX.
  • Commissioning:
  • Vacuum system: ISP power supply for OMC was implemented on 2/8.
  • Heater control:
  • TMS: Covering in TMSY on 2-3 March.

Discussion


VIS Meeting

Date: 2023/2/10 13:30-

Participants:

Summary Report

Type-A

  • Test of the IP control with the accelerometers in EX.

Type-B

Type-Bp

  • Last week, I calculated the shape of the sensor correction filter for the PRM BF Damper.
  • I uploaded the sensor correction filter in the corresponding filter bank.
  • I revisited the calculation of the inter-calibration factor between the seismometer on the ground and the BF Damper LVDT in L.

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: Sensor correction for PR3 and PR2.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 2/13

  • Takahashi: 2/15-17
  • Mitsuhashi: 2/15-17

Next meeting

  • 2023/2/17(FRI) 13:30-