Size: 1195
Comment:
|
Size: 1196
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 15: | Line 15: |
* Type-A: IP control with ACCs in EX. Offload of F0 in IY | * Type-A: IP control with ACCs in EX. Offload of F0 in IY. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/2/10 13:00-
Participants:
Status
- Type-A: IP control with ACCs in EX. Offload of F0 in IY.
- Type-B:
- Type-Bp: Sensor correction in PRM.
- Type-C:
Other items
- Oplev:
- ACC: IP control in EX.
- Commissioning:
- Vacuum system:
- Heater control:
- TMS: Covering in TMSY on 2-3 March.
Discussion
VIS Meeting
Date: 2023/2/10 13:30-
Participants:
Summary Report
Type-A
- Test of the IP control with the accelerometers in EX.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp: Sensor correction.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 2/13
- Takahashi: 2/15-17
- Mitsuhashi: 2/15-17
Next meeting
- 2023/2/17(FRI) 13:30-