Line 8: Line 8:
Date: 2023/2/17 13:00- Date: 2023/2/17 13:00-13:10
Line 10: Line 10:
Participants: Participants: Takahashi, Mitsuhashi, Ikeda, Sato, Kimura, Miyoki, Aso, Yasui, Hirata, Yokozawa, Ushiba
Line 15: Line 15:
 * Type-A: Coil driver for ACCs in EY.  * Type-A: Investigation of ACCs in EY.
Line 22: Line 22:
 * ACC:  * ACC: Replacement of the coil driver in EY was postponed.
Line 24: Line 24:
 * Vacuum system:  * Vacuum system: Switched from the TMP to the ISP in SRM.
Line 38: Line 38:
 * Replacement of the coil driver for ACCs in EY was postponed. A strange peak in the signal of ACC only is observed at 0.02Hz ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=23854|klog]]).
Line 40: Line 42:
 * PR3: I calculated the inter-calibration factor between the seismometer on ground and the BF Damper in L.
 * PR2: I tried to do the same for PR2, but the data is very noisy, and I was not able to get a reliable transfer function fit. It would be useful to get data with higher coherence.
Line 42: Line 46:
 * Tested a prototype pre-amp board for geophones using the spare geophone pod and the geophone distributor. The prototype board had the noise floor higher than the Nikhef one by one order at 1Hz ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=23996|klog]]).
Line 57: Line 63:
 * Hirata: 2/22

The week from 2/27

 * Aso: 2/27-28

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/2/17 13:00-13:10

Participants: Takahashi, Mitsuhashi, Ikeda, Sato, Kimura, Miyoki, Aso, Yasui, Hirata, Yokozawa, Ushiba

Acceptance check document

Status

  • Type-A: Investigation of ACCs in EY.
  • Type-B:
  • Type-Bp: Sensor correction in PR3.
  • Type-C:

Other items

  • Oplev:
  • ACC: Replacement of the coil driver in EY was postponed.
  • Commissioning:
  • Vacuum system: Switched from the TMP to the ISP in SRM.
  • Heater control:
  • TMS: Covering in TMSY on 2-3 March.

Discussion


VIS Meeting

Date: 2023/2/17 13:30-

Participants:

Summary Report

Type-A

  • Replacement of the coil driver for ACCs in EY was postponed. A strange peak in the signal of ACC only is observed at 0.02Hz (klog).

Type-B

Type-Bp

  • PR3: I calculated the inter-calibration factor between the seismometer on ground and the BF Damper in L.
  • PR2: I tried to do the same for PR2, but the data is very noisy, and I was not able to get a reliable transfer function fit. It would be useful to get data with higher coherence.

Type-C

Electronics

  • Tested a prototype pre-amp board for geophones using the spare geophone pod and the geophone distributor. The prototype board had the noise floor higher than the Nikhef one by one order at 1Hz (klog).

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: Sensor correction for PR3 and PR2.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 2/20

  • Hirata: 2/22

The week from 2/27

  • Aso: 2/27-28

Next meeting

  • 2023/2/24(FRI) 13:30-