⇤ ← Revision 1 as of 2023-03-09 17:25:10
Size: 1169
Comment:
|
Size: 1229
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 40: | Line 40: |
* Monitored the PRM suspension during the evacuation. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/3/10 13:00-
Participants:
Status
- Type-A: Offload of the F0 GAS in IY. DAC noise in ITMX.
- Type-B:
- Type-Bp: Monitoring of PRM during the evacuation.
- Type-C:
Other items
- Oplev:
- ACC:
- Commissioning:
- Vacuum system: The IFI-PRM chamber was evacuated on 3/6.
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2023/3/10 13:30-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
- Monitored the PRM suspension during the evacuation.
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp: BS sensor correction and blending.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 3/13
- Aso: 3/13-16
- Sato: 3/15-16
The week from 3/20
Next meeting
- 2023/3/17(FRI) 13:30-