Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/3/10 13:00-13:10
Participants: Takahashi, Kimura, Ikeda, Yokozawa, Miyoki, Sato, Aso, Hirata, Ushiba, Akutsu, Tomaru
Status
- Type-A: Offload of the F0 GAS in IY. DAC noise in ITMX.
- Type-B:
- Type-Bp: Monitoring of PRM during the evacuation.
- Type-C: Consider in-vac cabling.
Other items
- Oplev:
- ACC:
- Commissioning:
- Vacuum system: The IFI-PRM chamber was evacuated on 3/6.
- Heater control:
- TMS: Covering was completed.
Discussion
VIS Meeting
Date: 2023/3/10 13:30-13:40
Participants: Takahashi, Ushiba, Fabian, Tanaka, Aso
Summary Report
Type-A
Type-B
- BS IP: New sensor correction and blending filters were designed by Terrence. Today I'm writing them in the filter banks.
Type-Bp
- Monitored the PRM suspension during the evacuation.
Type-C
- We should check the effects due to the in-vac cables.
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp: BS sensor correction and blending.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 3/13
- Aso: 3/13-16
- Sato: 3/15-16
The week from 3/20
Next meeting
- 2023/3/17(FRI) 13:30-