Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2023-03-09 17:25:10
Size: 1169
Comment:
Revision 3 as of 2023-03-10 13:13:54
Size: 1366
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Date: 2023/3/10 13:00- Date: 2023/3/10 13:00-13:10
Line 10: Line 10:
Participants: Participants: Takahashi, Kimura, Ikeda, Yokozawa, Miyoki, Sato, Aso, Hirata, Ushiba, Akutsu, Tomaru
Line 18: Line 18:
 * Type-C:  * Type-C: Consider in-vac cabling.
Line 26: Line 26:
 * TMS:  * TMS: Covering was completed.
Line 40: Line 40:
 * Monitored the PRM suspension during the evacuation.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/3/10 13:00-13:10

Participants: Takahashi, Kimura, Ikeda, Yokozawa, Miyoki, Sato, Aso, Hirata, Ushiba, Akutsu, Tomaru

Acceptance check document

Status

  • Type-A: Offload of the F0 GAS in IY. DAC noise in ITMX.
  • Type-B:
  • Type-Bp: Monitoring of PRM during the evacuation.
  • Type-C: Consider in-vac cabling.

Other items

  • Oplev:
  • ACC:
  • Commissioning:
  • Vacuum system: The IFI-PRM chamber was evacuated on 3/6.
  • Heater control:
  • TMS: Covering was completed.

Discussion


VIS Meeting

Date: 2023/3/10 13:30-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

  • Monitored the PRM suspension during the evacuation.

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: BS sensor correction and blending.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 3/13

  • Aso: 3/13-16
  • Sato: 3/15-16

The week from 3/20

Next meeting

  • 2023/3/17(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230310 (last edited 2023-03-10 13:45:37 by RyutaroTakahashi)