Differences between revisions 1 and 2
Revision 1 as of 2023-03-23 11:13:12
Size: 1241
Comment:
Revision 2 as of 2023-03-23 11:15:35
Size: 1241
Comment:
Deletions are marked like this. Additions are marked like this.
Line 58: Line 58:
The week from 3/20 The week from 3/27

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/3/24 13:00-

Participants:

Acceptance check document

Status

  • Type-A: Offloading and heater control in EX. Sensor correction in IY.
  • Type-B: Sensor correction in BS.
  • Type-Bp:
  • Type-C:

Other items

  • Oplev:
  • ACC: Replacement of the coil driver in EY.
  • Commissioning:
  • Vacuum system:
  • Heater control: Using in IY and EX.
  • TMS:

Discussion


VIS Meeting

Date: 2023/3/24 13:30-

Participants:

Summary Report

Type-A

  • Turned the heater on and offloaded the F0 in EX.
  • Investigating the performance of the sensor correction.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: BS sensor correction and blending.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 3/27

Next meeting

  • 2023/3/31(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230324 (last edited 2023-03-24 13:41:57 by RyutaroTakahashi)