Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/3/24 13:00-13:15
Participants: Takahashi, Mitsuhashi, Sato, Yokozawa, Ikeda, Ushiba, Yasui, Uchiyama, Hirata, Akutsu, Miyoki
Status
- Type-A: Offloading and heater control in EX. Sensor correction in IY.
- Type-B: Sensor correction in BS.
- Type-Bp:
- Type-C:
Other items
- Oplev:
- ACC: Replacement of the coil driver in EY.
- Commissioning:
- Vacuum system:
- Heater control: Using in IY and EX.
- TMS: Green image dropped down.
Discussion
VIS Meeting
Date: 2023/3/24 13:30-
Participants: Takahashi, Mitsuhashi, Hirata, Ushiba, Fabian, Sato, Tanaka
Summary Report
Type-A
- Turned the heater on and offloaded the F0 in EX.
- Investigating the performance of the sensor correction.
- Replaced the coil driver for the accelerometers in EY.
Type-B
- Sensor correction in BS.
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 3/27
- Fabian: 3/27-4/18 (vacation)
Next meeting
- 2023/3/31(FRI) 13:30-