Differences between revisions 2 and 5 (spanning 3 versions)
Revision 2 as of 2023-03-23 11:15:35
Size: 1241
Comment:
Revision 5 as of 2023-03-24 13:18:47
Size: 1423
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Date: 2023/3/24 13:00- Date: 2023/3/24 13:00-13:15
Line 10: Line 10:
Participants: Participants: Takahashi, Mitsuhashi, Sato, Yokozawa, Ikeda, Ushiba, Yasui, Uchiyama, Hirata, Akutsu, Miyoki
Line 26: Line 26:
 * TMS:  * TMS: Green image dropped down.
Line 40: Line 40:
 * Replaced the coil driver for the accelerometers in EY.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/3/24 13:00-13:15

Participants: Takahashi, Mitsuhashi, Sato, Yokozawa, Ikeda, Ushiba, Yasui, Uchiyama, Hirata, Akutsu, Miyoki

Acceptance check document

Status

  • Type-A: Offloading and heater control in EX. Sensor correction in IY.
  • Type-B: Sensor correction in BS.
  • Type-Bp:
  • Type-C:

Other items

  • Oplev:
  • ACC: Replacement of the coil driver in EY.
  • Commissioning:
  • Vacuum system:
  • Heater control: Using in IY and EX.
  • TMS: Green image dropped down.

Discussion


VIS Meeting

Date: 2023/3/24 13:30-

Participants:

Summary Report

Type-A

  • Turned the heater on and offloaded the F0 in EX.
  • Investigating the performance of the sensor correction.
  • Replaced the coil driver for the accelerometers in EY.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: BS sensor correction and blending.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 3/27

Next meeting

  • 2023/3/31(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230324 (last edited 2023-03-24 13:41:57 by RyutaroTakahashi)