Differences between revisions 1 and 2
Revision 1 as of 2023-05-11 14:21:10
Size: 1217
Comment:
Revision 2 as of 2023-05-12 12:03:05
Size: 1267
Comment:
Deletions are marked like this. Additions are marked like this.
Line 40: Line 40:
 * Optimization of the damping control in PR2.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/5/12 13:00-

Participants:

Acceptance check document

Suspensions

  • Type-A: Recovery from the EQ. TM local damping. Oplev QPD centering in EY.
  • Type-B: Recovery from the EQ. Measurements on the sensor correction in SR2.
  • Type-Bp: Recovery from the EQ. Optimization of the damping control in PR2.
  • Type-C: Recovery from the EQ.

Other items

  • Oplev: QPD centering.
  • ACC:
  • Commissioning: Measurements of DAC noise.
  • Vacuum system:
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2023/5/12 13:30-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

  • Optimization of the damping control in PR2.

Type-C

Electronics

Control

R&D

Schedule

  • Type-A:
  • Type-B:
  • Type-Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 5/15

Next meeting

  • 2023/5/19(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230512 (last edited 2023-05-12 13:44:50 by RyutaroTakahashi)