⇤ ← Revision 1 as of 2023-05-11 14:21:10
Size: 1217
Comment:
|
Size: 1267
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 40: | Line 40: |
* Optimization of the damping control in PR2. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/5/12 13:00-
Participants:
Suspensions
- Type-A: Recovery from the EQ. TM local damping. Oplev QPD centering in EY.
- Type-B: Recovery from the EQ. Measurements on the sensor correction in SR2.
- Type-Bp: Recovery from the EQ. Optimization of the damping control in PR2.
- Type-C: Recovery from the EQ.
Other items
- Oplev: QPD centering.
- ACC:
- Commissioning: Measurements of DAC noise.
- Vacuum system:
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2023/5/12 13:30-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
- Optimization of the damping control in PR2.
Type-C
Electronics
Control
R&D
Schedule
- Type-A:
- Type-B:
- Type-Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 5/15
Next meeting
- 2023/5/19(FRI) 13:30-