CRY+VIS Interface Meeting
Date: 2023/5/12 13:00-13:15
Participants: Takahashi, Mitsuhashi, Ikeda, Akutsu, Ushiba, Uchiyama, Miyoki, Sato, Hirata, Aso
Suspensions
- Type-A: Recovery from the EQ. TM local damping. Oplev QPD centering in EY.
- Type-B: Recovery from the EQ. Measurements on the sensor correction in SR2.
- Type-Bp: Recovery from the EQ. Optimization of the damping control in PR2.
- Type-C: Recovery from the EQ.
Other items
- Oplev: QPD centering.
- ACC:
- Commissioning: Measurements of DAC noise.
- Vacuum system: Connection of the vacuum gauge at X-27.
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2023/5/12 13:30-13:40
Participants: Takahashi, Fabian, Mitsuhashi, Ushiba, Uchiyama, Aso
Summary Report
Type-A
Type-B
- Takahashi-san tested sensor correction and blending filters designed by Terrence, for IP-L in SR2. The sensor correction worked well, but there was a problem in the design of the blending filters. Terrence has corrected the error and the measurement will be repeated again on Monday evening.
Type-Bp
- Optimization of the damping control in PR2.
Type-C
Electronics
Control
R&D
Schedule
- Sensor correction in SR2.
- Offloading all suspensions on 5/16.
- Final week for Fabian.
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 5/15
Next meeting
- 2023/5/19(FRI) 13:30-