Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/5/19 13:00-

Participants:

Acceptance check document

Suspensions

  • Type-A: Offload.
  • Type-B: Offload. Measurements on the sensor correction in SR2.
  • Type-Bp:
  • Type-C:

Other items

  • Oplev:
  • ACC:
  • Commissioning: Measurements of DAC noise.
  • Vacuum system:
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2023/5/19 13:30-

Participants:

Summary Report

Type-A

  • Offloaded some suspensions to start O4a.

Type-B

  • Offloaded some suspensions to start O4a.

Type-Bp

Type-C

Electronics

Control

R&D

Schedule

  • O4a start.

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 5/22

Next meeting

  • 2023/5/26(FRI) 13:30-