Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/5/19 13:00-13:20
Participants: Takahashi, Uchiyama, Hirata, Aso, Miyuki, Sato, Ushiba, Akutsu, Kimura, Node
Suspensions
- Type-A: Offload.
- Type-B: Offload. Measurements on the sensor correction in SR2.
- Type-Bp:
- Type-C:
Other items
- Oplev:
- ACC:
- Commissioning: Measurements of DAC noise.
- Vacuum system: Pressure in EX is unstable.
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2023/5/19 13:30-13:40
Participants: Takahashi, Uchiyama, Ushiba, Tanaka, Aso, Mitsuhashi
Summary Report
Type-A
- Offloaded some suspensions to start O4a.
Type-B
- Offloaded some suspensions to start O4a.
Type-Bp
Type-C
Electronics
Control
R&D
Schedule
- O4a start.
Safety
Discussion
- VIS meeting from now on; style, date/time, topics, ... etc.
Travel Plans
(Date in Kamioka)
The week from 5/22
Next meeting
- 2023/5/?