Differences between revisions 3 and 4
Revision 3 as of 2023-05-19 13:23:24
Size: 1209
Comment:
Revision 4 as of 2023-05-19 14:11:20
Size: 1266
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
Date: 2023/5/19 13:30- Date: 2023/5/19 13:30-13:40
Line 34: Line 34:
Participants: Participants: Takahashi, Uchiyama, Ushiba, Tanaka, Aso, Mitsuhashi

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/5/19 13:00-13:20

Participants: Takahashi, Uchiyama, Hirata, Aso, Miyuki, Sato, Ushiba, Akutsu, Kimura, Node

Acceptance check document

Suspensions

  • Type-A: Offload.
  • Type-B: Offload. Measurements on the sensor correction in SR2.
  • Type-Bp:
  • Type-C:

Other items

  • Oplev:
  • ACC:
  • Commissioning: Measurements of DAC noise.
  • Vacuum system: Pressure in EX is unstable.
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2023/5/19 13:30-13:40

Participants: Takahashi, Uchiyama, Ushiba, Tanaka, Aso, Mitsuhashi

Summary Report

Type-A

  • Offloaded some suspensions to start O4a.

Type-B

  • Offloaded some suspensions to start O4a.

Type-Bp

Type-C

Electronics

Control

R&D

Schedule

  • O4a start.

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 5/22

Next meeting

  • 2023/5/26(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230519 (last edited 2023-05-22 08:26:45 by RyutaroTakahashi)