Differences between revisions 3 and 4
Revision 3 as of 2023-06-01 13:46:46
Size: 828
Comment:
Revision 4 as of 2023-06-02 08:44:29
Size: 828
Comment:
Deletions are marked like this. Additions are marked like this.
Line 33: Line 33:
  * IP control with the ACCs (Replacement of the HPCD in EX.).   * IP control with the ACCs. (Replacement of the HPCD in EX.)

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/6/2 13:00-

Participants:

Acceptance check document

Suspensions

  • Type-A:
  • Type-B:
  • Type-Bp:
  • Type-C:

Other items

  • Oplev:
  • ACC:
  • Commissioning:
  • Vacuum system:
  • Heater control:
  • TMS:

Discussion

  • Post-O4a
    • Measurements of the DAC noise.
    • Measurements on the sensor correction in SR2.
    • Optimization of the damping control in PRs.
    • IP control with the ACCs. (Replacement of the HPCD in EX.)
    • In-vacuum accelerometer for IOO.
    • Hight adjustments in Type-A in the cooling.

KAGRA/Subgroups/VIS/VISMinutes20230602 (last edited 2023-06-02 13:56:36 by RyutaroTakahashi)