Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/6/2 13:00-13:20
Participants: Takahashi, Uchiyama, Yokozawa, Miyoki, Kimura, Mitsuhashi, Akutsu, Hirata, Ushiba, Ikeda, Aso
Suspensions
- Type-A:
- Type-B:
- Type-Bp:
- Type-C: Setting of the Watch Dog, from 1000 to 30000?
Other items
- Oplev: Investigation of the PR3 drift. EY temperature control for glitches to IY. IR green filter.
- ACC:
- Commissioning:
- Vacuum system:
- Heater control:
- TMS:
Discussion
- Post-O4a
- Measurements of the DAC noise.
- Measurements on the sensor correction in SR2.
- Optimization of the damping control in PRs.
- IP control with the ACCs.
- In-vacuum accelerometer for IOO.
- Hight adjustments of Type-A in the cooling.
- Measurement of the drum-head modes.
- Check of the length Oplev.
- Check of the sensor noise in the cryo-payloads.