795
Comment:
|
← Revision 6 as of 2023-06-02 13:56:36 ⇥
1155
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Date: 2023/6/2 13:00- | Date: 2023/6/2 13:00-13:20 |
Line 10: | Line 10: |
Participants: | Participants: Takahashi, Uchiyama, Yokozawa, Miyoki, Kimura, Mitsuhashi, Akutsu, Hirata, Ushiba, Ikeda, Aso |
Line 18: | Line 18: |
* Type-C: | * Type-C: Setting of the Watch Dog, from 1000 to 30000? |
Line 21: | Line 21: |
* Oplev: | * Oplev: Investigation of the PR3 drift. EY temperature control for glitches to IY. IR green filter. |
Line 35: | Line 35: |
* Hight adjustments in Type-A in the cooling. | * Hight adjustments of Type-A in the cooling. * Measurement of the drum-head modes. * Check of the length Oplev. * Check of the sensor noise in the cryo-payloads. |
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/6/2 13:00-13:20
Participants: Takahashi, Uchiyama, Yokozawa, Miyoki, Kimura, Mitsuhashi, Akutsu, Hirata, Ushiba, Ikeda, Aso
Suspensions
- Type-A:
- Type-B:
- Type-Bp:
- Type-C: Setting of the Watch Dog, from 1000 to 30000?
Other items
- Oplev: Investigation of the PR3 drift. EY temperature control for glitches to IY. IR green filter.
- ACC:
- Commissioning:
- Vacuum system:
- Heater control:
- TMS:
Discussion
- Post-O4a
- Measurements of the DAC noise.
- Measurements on the sensor correction in SR2.
- Optimization of the damping control in PRs.
- IP control with the ACCs.
- In-vacuum accelerometer for IOO.
- Hight adjustments of Type-A in the cooling.
- Measurement of the drum-head modes.
- Check of the length Oplev.
- Check of the sensor noise in the cryo-payloads.