CRY+VIS Interface Meeting
Date: 2023/9/22 13:00-13:30
Participants: Takahashi, Aso, Ushiba, Yokozawa, Hirata, Ikeda, Sato, Mitsuhashi
Suspensions
- Type-A: Height adjustment of ETMX. Offload in IX and EX. Elena-san will try to damp ITMX.
 - Type-B: Measurement on the sensor correction in SR2.
 - Type-Bp: Test of damping control.
 - Type-C:
 
Other items
- Oplev: Check of TM Oplev in EX.
 - ACC:
 - Commissioning:
 - Vacuum system: Waiting for the GV opening in EX.
 - Heater control:
 - TMS:
 
Post O4a
- Measurements of the DAC noise: Type-C.
 - Measurements on the sensor correction in SR2: Performed by Terrence on 9/12.
 - Optimization of the damping control in PRs: Tested for PR3 and PRM on 9/12.
 - IP control with the ACCs: One more test is necessary.
 - In-vacuum accelerometer for IOO: Leak test of the pod is planned in early October.
 - Hight adjustments of Type-A in the cooling: Monitoring from 9/8.
 - Temperature control for the Oplev: Prepare for IXC and EXC.
 - TM cooling: Schedule.
 - IM heater: Setup for IX and EY was finished.
 - OMC damper: The parts should be prepared by 9/13.
 
Discussion
VIS Meeting
Date: 2023/9/22 10:00-10:45
Participants: Takahashi, Tanaka, Sato, Ushiba, Hirata, Mitsuhashi
Summary Report
Type-A
- Height adjustment of ETMX.
 
Type-B
- Measurement on the sensor correction in SR2 by Terrence.
 
Type-Bp
- Optimization of damping controls for PR3 and PRM. The behavior of angular fluctuation should be checked as well in PR3.
 
Type-C
- Damping of the OMC suspension. 
- Production of the blade damper.
 - Prototype test of the flexible pendulum damper.
 
 
Electronics
Control
R&D
- TAMA-SAS experiment: TF measurement of IP+RL.
 
Schedule
- TAMA-SAS experiment.
 - Finalization of the OMC damper.
 
Toward O5
Discussion
Next meeting
- 2023/9/29 10:00-
 