Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/10/6 13:00-
Participants:
Suspensions
- Type-A: Offload in IX. Test of IP control with ACCs in IY.
- Type-B:
- Type-Bp:
- Type-C:
Other items
- Oplev:
- ACC:
- Commissioning:
- Vacuum system: Investigation of the TMP in X-27.
- Heater control:
- TMS:
Post O4a
- Measurements of the DAC noise: Type-C.
- Optimization of the damping control in PRs: Test for PR3 again.
- IP control with the ACCs: One more test.
- In-vacuum accelerometer for IOO: Leak test of the geophone pods. The new pod passed for the OMC chamber.
- Height adjustments of Type-A in the cooling: Monitoring.
- Temperature control for the Oplev: Preparation for IXC and EXC.
- TM cooling: Schedule.
- IM heater: EX remains.
- OMC damper: The parts have been ordered. Vent on 10/13.
Discussion