Contents
Agenda/Minutes
VIS Meeting
Date: 2023/10/27 10:00-
Participants:
Summary Report
Type-A
- Height adjustment of ETMX.
- Test of the IP control with ACC.
Type-B
Type-Bp
Type-C
- The geophone pod was installed to the OMC chamber on 10/17.
- The blade/board dampers for the OMC suspension was Installed on 10/17-18.
Electronics
Control
R&D
- TAMA-SAS experiment: Calculation of the RL potential.
Schedule
- TAMA-SAS experiment.
Toward O5
Discussion
Next meeting
- 2023/11/10 10:00-