Differences between revisions 6 and 7
Revision 6 as of 2024-12-20 09:50:58
Size: 1162
Comment:
Revision 7 as of 2024-12-20 10:44:42
Size: 1198
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
Participants: Participants: Aso, Akutsu, Sato, Tanaka, Takahashi


VIS Meeting

Date: 2024/12/20 10:00-

Zoom

Participants: Aso, Akutsu, Sato, Tanaka, Takahashi

Topics

Type-A

  • Height adjustment during the cooling.
  • ACCs for the IP controls.
    • Preparing for the stand-alone test bench with DGS in Mitaka.

Type-B/Bp

  • The function generator for the BS/PR2 LVDTs was broken.
    • The SG card should be enclosed in an independent box.
  • Yaw damper for Type-B.
  • IP for Type-Bp.

Type-C

  • Active isolation table for OMC.
  • Isolation in the IFI chamber (latest measurement).

    • Small suspensions for the steering mirrors.
    • Active damping for the steering mirrors.
    • Replacement of the stack with an active isolation.

R&D

Discussion

Next meeting

  • 2025/1/17 10:00-

KAGRA/Subgroups/VIS/VISMinutes20241220 (last edited 2024-12-20 10:44:54 by RyutaroTakahashi)