VIS Meeting
Date: 2024/12/20 10:00-10:40
Participants: Aso, Akutsu, Sato, Tanaka, Takahashi
Topics
Type-A
- Height adjustment during the cooling.
- ACCs for the IP controls.
- Preparing for the stand-alone test bench with DGS in Mitaka.
Type-B/Bp
- The function generator for the BS/PR2 LVDTs was broken.
- The SG card should be enclosed in an independent box.
- Yaw damper for Type-B.
- IP for Type-Bp.
Type-C
- Active isolation table for OMC.
Sato-san checked the fitting condition of the TMS isolator to the OMC chamber (Interface, Counter weight).
Isolation in the IFI chamber (latest measurement).
- Small suspensions for the steering mirrors.
- Active damping for the steering mirrors.
- Replacement of the stack with an active isolation.
R&D
Discussion
Next meeting
- 2025/1/17 10:00-