Contents
VIS Meeting
Date: 2025/1/17 10:00-10:40
Participants: Sato, Tanaka, Ushiba, Yokozawa, Washimi, Takahashi
Topics
Type-A
- Height adjustment during the cooling.
- Final adjustment was performed on Jan. 17th.
- ACCs for the IP controls.
- Preparing for the stand-alone test bench with DGS in Mitaka. Ikeda-san has set the DGS up in the ATC lab.
Type-B/Bp
- Enclosure for the SG card into an independent box.
- Asking Tanaka-san. The card has a regulator to convert +/-18V to +/-15V.
- Yaw damper for Type-B.
- One set should be tested in SRM around autumn 2025.
- IP for Type-Bp.
Type-C
- Active isolation table for OMC.
Sato-san is checking the fitting condition of the TMS isolator to the OMC chamber (update). The structural mode also should be checked.
- Vibration in the IFI chamber
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
Next meeting
- 2025/1/31 10:00-