Contents
VIS Meeting
Date: 2025/2/28 10:00-10:30
Participants: Aso, Ushiba, Takahashi
Topics
Type-A
- ACCs for the IP controls.
- The stand-alone test bench for ACC with DGS was prepared in Mitaka. There is still a problem in the DGS.
Type-B/Bp
- Enclosure for the SG card into an independent box.
- Tanaka-san is making a prototype.
- Yaw damper for Type-B.
- One set should be tested in SRM around autumn 2025.
- IP for Type-Bp.
Type-C
- Active isolation table for OMC.
- Sato-san is checking the parameters of the TMS isolator for OMC.
- Asking Marutsu to make geophone pre-amp boards.
- Vibration in the IFI chamber
- Fixing the STM in the IFI chamber is planned for March 17th.
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
Next meeting
- 2025/3/28 10:00-