VIS Meeting

Date: 2025/3/28 10:00-

Zoom

Participants:

Topics

Type-A

  • ACCs for the IP controls.
    • Evaluation of the ACC is ongoing with DGS in ATC.

Type-B/Bp

  • Enclosure for the SG card into an independent box.
    • Tanaka-san is making a prototype.
  • Yaw damper for Type-B.
    • We asked ATC about the design of the IRM damper as the item in 2025FY. Conceptual design is here.

  • IP for Type-Bp.

Type-C

  • Active isolation table for OMC.
    • Akutsu-san closs-checked the model with the Mathematica code. Jacks under the support bellows may be necessary to adjust the height of the table.
    • The new geophone pre-amp boards had a problem. The power lines were grounded.
  • Vibration in the IFI chamber
    • The geophone pod was assembled and passed the leak check, but we gave up on installing it.
    • The STM2 was successfully fixed on 26th.
  • Small Type-C suspensions with mini-GAS.