Contents
VIS Meeting
Date: 2025/3/28 10:00-11:00
Participants: Ushiba, Washimi, Sato, Tanaka, Takahashi
Topics
Type-A
- ACCs for the IP controls. 
- Evaluation of the ACC is ongoing with DGS in ATC.
 
 
Type-B/Bp
- Enclosure for the SG card into an independent box. 
Tanaka-san made a prototype box. It is better to mount a 1U pannel like this.
 - Yaw damper for Type-B. 
We asked ATC about the design of the IRM damper as the item in 2025FY. Conceptual design is here. Actuator noise should be estimated by comparing it with the OSEM.
 - IP for Type-Bp.
 
Type-C
- Active isolation table for OMC. 
- Akutsu-san closs-checked the model with the Mathematica code. Jacks under the support bellows may be necessary to adjust the height of the table.
 - The new geophone pre-amp boards had a problem. The power lines were grounded.
 
 - Vibration in the IFI chamber 
The geophone pod was assembled and passed the leak check, but we gave up on installing it. Washimi-san suggested a handmade in-vac. mini-geophone.
- The STM2 was successfully fixed on 26th.
 
 - Small Type-C suspensions with mini-GAS.
 
R&D
Discussion
Next meeting
- 2025/4/11 10:00-
 
